Minutes

Independent Hearing and Assessment Panel Meeting

13 October 2015, 5:00pm

.


Independent Hearing and Assessment Panel 13 October 2015

Minutes

 

 

 

PRESENT:                  Mr Kevin Hoffman, Chair, Mr Trevor Bly, Planning Expert, Mr David Johnson, Environmental Expert and Sarah Balzer, Community Representative

 

ALSO PRESENT:       Mr Michael Mason, Executive Manager, Environmental Services, Ms May Li, Senior Town Planner, Mr Stan Raymont, Town Planner and Angela Panich, Panel Secretariat

 

DECLARATIONS OF INTEREST:   Nil

 

WEBCASTING OF COUNCIL MEETING

The Chairperson advised those present that the Meeting was being webcast.

 

Independent Hearing and Assessment Panel Reports

 

14 Haughton Street, Linley Point

 

DETERMINATION

 

A.        That pursuant to Section 80(3) of the Environmental Planning and Assessment Act, 1979, as amended, the Independent Hearing and Assessment Panel grants a deferred development consent to Development Application 42/2015 for the demolition of all existing structures, construction of a dwelling house and a swimming pool on Lot 1, DP 15192 and is known as 14 Haughton Street, Linley Point subject to the following:

 

1.   Documentary evidence demonstrating the applicant has been granted permission for an interallotment drainage easement from a downstream property owner to drain the stormwater from the proposed new dwelling to the foreshore.

 

Approval must be submitted to Council within 12 months of the granting of this deferred commencement consent. Commencement of the approval cannot commence until written approval of the submitted information has been given by Council.

 

B.        Subject to A. above being satisfied, a development consent and plans be issued, subject to the following conditions:

 

General Conditions

 

1.         (20) That the development be strictly in accordance with the following drawings dated 18.02.2015, prepared by Teknicon Design Pty Ltd except as amended by the following conditions.

 

-     Site Plan, DWG No. DA01, Issue D, dated 25.8.2015;

-     Proposed Basement Floor Plan, DWG No. DA02, Issue E, dated 10.07.2015;

-     Proposed Ground Floor Plan, DWG No. DA03, Issue C, dated 19.05.2015;

-     Proposed first Floor Plan, DWG No. DA04, Issue E, dated 25.08.2015;

-     Proposed Cabana/Pool Plan, DWG No. DA05, Issue C, dated 19.05.2015;

-     Proposed Roof Plan, DWG No. DA06, Issue D, dated 25.08.2015;

-     Proposed North elevation, DWG No. 07, Issue E, dated 25.08.2015;

-     Proposed West Elevation, DWG No. 08, Issue D, dated 25.08.2015;

-     Proposed south Elevation, DWG No. 09, Issue D, dated 25.08.2015;

-     Proposed East Elevation, DWG No. DA10, Issue E, dated 28.08.2015;

-     Proposed Section A-A DWG No. DA11, Issue D, dated 25.08.2015;

-     Proposed Section B-B, DWG No. DA12, Issue D, dated 25.08.2015;

-     Proposed Section C-C, DWG No. DA13, Issue E, dated 25.08.2015;

-     Proposed Section D-D, DWG No. DA14, Issue D, dated 25.08.2015.

 

2.         Amended plans and specifications incorporating the following amendments are to be submitted with the application for a construction certificate

 

(a)     The design of the cabana must be remained open to the pool decking area.

 

(b)     The double carport located in front of the garage shall not be enclosed and converted into garage/storage.

 

(c)     The maximum width of the vehicle crossing at the property front boundary to Haughton Street is 3m. 

 

(d)     Deleted 

 

(e)     The Landscape Plan, 5110-01, Issue A, prepared by Peter Glass & Associates, dated 06/03/2015 shall be amended in accordance with the approved architectural plans. 

 

             (f)     The Terrace shown on the First Floor Plan south of the southern-most Bedroom on that level to be deleted as a Terrace along with the planterbox and balustrades shown on the plans and elevations.  That area is to be shown as an inaccessible roof area. The planterbox, in being deleted, shall have its upstands removed, and the western roof edge parapet shall match the other roof edges at RL43.530.  A balustrade preventing access to this roof area, to be shown across the opening between the eastern terrace on the First Floor and this roof.  The balustrade to be located adjacent to the corner wall at windows W23 and W22, and connecting across to the balustrade of the eastern terrace.  The balustrade to be 1.8m high above the terrace floor and designed without foot or hand holds that would enable it to be climbed over. 

 

3.         (1) The submission of a Construction Certificate and its issue by Council or Private Certifier PRIOR TO CONSTRUCTION WORK commencing.

 

4.         (2) All building works are required to be carried out in accordance with the provisions of the Building Code of Australia.

 

5.         (11) The approved plans must be submitted to a Sydney Water Check agent or Customer Centre to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if further requirements need to be met.  Plans will be appropriately stamped.  For Quick Check agent details please refer to the web site www.sydneywater.com.au see Your Business then Building & Developing then Building & Renovating or telephone 13 20 92.

 

The consent authority or a private accredited certifier must:-

·          Ensure that a Quick Check agent/Sydney Water has appropriately stamped the plans before the issue of any Construction Certificate.

 

6.         (12) Approval is subject to the condition that the builder or person who does the residential building work complies with the applicable requirements of Part 6 of the Home Building Act 1989 whereby a person must not contract to do any residential building work unless a contract of insurance that complies with this Act is in force in relation to the proposed work.  It is the responsibility of the builder or person who is to do the work to satisfy Council or the PCA that they have complied with the applicable requirements of Part 6.  Council as the PCA will not release the Construction Certificate until evidence of Home Owners Warranty Insurance or an owner builder permit is submitted. THE ABOVE CONDITION DOES NOT APPLY TO COMMERCIAL/INDUSTRIAL CONSTRUCTION, OWNER BUILDER WORKS LESS THAN $5000 OR CONSTRUCTION WORKS LESS THAN $20,000.

 

7.         (17)  An Occupation Certificate being obtained from the Principal Certifying Authority before the occupation of the building.

 

8.         (35)  All demolition, building construction work, including earthworks, deliveries of building materials to and from the site to be restricted to the following hours:-

 

Monday to Friday (inclusive)                     7.00am to 5.30pm

Saturday                                                   7.00am to 4.00pm

No work to be carried out on Sundays or any public holidays.

 

A Notice/Sign showing permitted working hours and types of work permitted during those hours, including the applicant’s phone number, project manager or site foreman, shall be displayed at the front of the site.

 

9.         (36) Stockpiles of topsoil, sand, aggregate, spoil or other material capable of being moved by water to be stored clear of any drainage line, easement, natural watercourse, footpath, kerb or roadside.

 

10.       (37) The development shall be conducted in such a manner so as not to interfere with the amenity of the neighbourhood in respect of noise, vibration, smell, dust, waste water, waste products or otherwise.

 

11.       (48) Depositing or storage of builder's materials on the footpath or roadways within the Municipality without first obtaining approval of Council is PROHIBITED.

 

Separate approval must be obtained from Council's Works and Urban Services Department PRIOR TO THE PLACEMENT of any building waste container ("Skip") in a public place.

 

12.       (49) Prior to the commencement of any construction work associated with the development, the Applicant shall erect a sign(s) at the construction site and in a prominent position at the site boundary where the sign can be viewed from the nearest public place.  The sign(s) shall indicate:

a)      the name, address and telephone number of the Principal Certifying Authority;

b)      the name of the person in charge of the construction site and telephone number at which that person may be contacted outside working hours; and

c)      a statement that unauthorised entry to the construction site is prohibited.

 

The signs shall be maintained for the duration of construction works.

 

13.       (50) The cleaning out of ready-mix concrete trucks, wheelbarrows and the like into Council's gutter is PROHIBITED.

 

14.       (51) Lane Cove Council regulates the Preservation of Trees and Vegetation in the Lane Cove local government area. Clause 5.9(3) of Lane Cove Local Environmental Plan 2009 [the "LEP"], states that a person must not ringbark, cut down, top, lop, remove, injure or willfully destroy any tree or other vegetation to which any such development control plan applies without the authority conferred by development consent or a permit granted by the Council. Removal of trees or vegetation protected by the regulation is an offence against the Environmental Planning and Assessment Act 1979 (NSW). The maximum penalty that may be imposed in respect to any such offence is $1,100,000. The co-operation of all residents is sought in the preservation of trees in the urban environment and protection of the bushland character of the Municipality. All enquiries concerning the preservation of trees and vegetation must be made at the Council Chambers, Lane Cove.

 

15.       (52) The swimming pool being surrounded by a fence:-

 

a) That forms a barrier between the swimming pool; and

i)   any residential building or movable dwelling situated on the premises; and

ii)  any place (whether public or private) adjacent to or adjoining the premises; and

 

b) That is designed, constructed and installed in accordance with the standards as prescribed by the Regulations under the Swimming Pool Act, 1992, and the Australian Standard AS1926 – 2012, “Swimming Pool Safety”.

 

SUCH FENCE IS TO BE COMPLETED BEFORE THE FILLING OF THE SWIMMING POOL

 

ADVICE: In accordance with the Swimming Pools Amendment Act 2012, the swimming pool or spa is required to be registered on the NSW Government State wide Swimming Pool Register when completed.

 

The register can be found at www.swimmingpoolregister.nsw.gov.au.

 

16.       (53) The filter and pump being located in a position where it will create no noise nuisance at any time or, alternatively, being enclosed in an approved soundproof enclosure.  If noise generated as a result of the development results in an offensive noise Council, may prohibit the use of the unit, under the provisions of the Protection of the Environment Operations Act 1997.

 

17.       (54) In accordance with the requirements of the Swimming Pools Act 1992 and Regulations thereunder a warning notice is to be displayed in a prominent position in the immediate vicinity of the swimming pool at all times.

 

The notice must be in accordance with the standards of the Australian Resuscitation Council for instructional posters and resuscitation techniques and must contain a warning "YOUNG CHILDREN SHOULD BE SUPERVISED WHEN USING THIS POOL".

 

18.       (55) Fibrecrete Swimming Pool Shell being constructed in accordance with AS.2783-1985 "Concrete Swimming Pool Code, AS 3600-1988 - "Concrete Structure" and "AW1 Fibresteel Technical Manual, November 1981".

 

19.       Standard Condition (56) Where Lane Cove Council is appointed as the Principal Certifying Authority, it will be necessary to book an inspection for each of the following stages during the construction process.  Forty eight (48) hours notice must be given prior to the inspection being required:-

a)      The pier holes/pads before filling with concrete.

b)      All reinforcement prior to filling with concrete.

c)      The dampcourse level, ant capping, anchorage and floor framing before the floor material is laid.

d)      Framework including roof and floor members when completed and prior to covering.

e)      Installation of steel beams and columns prior to covering.

f)       Waterproofing of wet areas.

g)      Pool reinforcement prior to placement of concrete.

h)      The swimming pool safety fence and the provision of the resuscitation poster prior to filling of the pool with water.

i)       Stormwater drainage lines prior to backfilling.

j)       Completion.

 

20.       Standard Condition (57) Structural Engineer's details being submitted PRIOR TO ISSUE OF CONSTRUCTION CERTIFICATE for the following:-

a)         underpinning;

b)         retaining walls;

c)         footings;

d)         reinforced concrete work;

e)         structural steelwork; and

f)          upper level floor framing.

 

21.       (58) Structural Engineer's Certificate being submitted certifying that existing building is capable of carrying the additional loads.  Such Certificate being submitted PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE.

 

22.       (63) All metal deck roofs being of a ribbed metal profile or colourbond corrugated galvanised or zincalume iron, in a mid to dark colour range.

 

23.       Standard Condition (64) A check survey certificate is to be submitted at the completion of:-

a)         The establishment of each floor level;

b)         The roof framing; and

c)         The completion of works.

 

Note:   All levels are to relate to the reduced levels as noted on the approved architectural plans and should be cross-referenced to Australian Height Datum.

 

24.       (66) The removal, handling and disposal of asbestos from building sites being carried out in accordance with the requirements of the Occupational Health and Safety Act and the Regulations.  Details of the method of removal to be submitted PRIOR TO COMMENCING ANY DEMOLITION WORKS.

 

25.       (72) The proposed works must be confined within the boundaries of the site.

 

26.       (77) All spillage deposited on the footpaths or roadways to be removed at the completion of each day work.

 

27.       (78) The site being properly fenced to prevent access of unauthorised persons outside of working hours.

 

28.       (79) Compliance with Australian Standard 2601 - The Demolition of Structures.

 

29.       (130)  Compliance with the Waste Management Plan submitted along with the application.

 

30.       (132)  It should be understood that this consent in no way relieves the owners or applicant from any obligation to obtain any other approval which may be required under any covenant affecting the land or otherwise nor relieve a person from the legal civil consequences of not complying with any such covenant.

 

31.       (141) Long Service Levy  Compliance with Section 109F of the Environmental Planning and Assessment Act 1979; payment of the Long Service Levy payable under Section 34 of the Building and Construction Industry Long Service Payments Act 1986 (or, where such a levy is payable by instalments, the first instalment of the levy) – All building works in excess of $25,000 are subject to the payment of a Long Service Levy at the rate of 0.35%.

 

COMPLIANCE WITH THE REQUIREMENTS OF THIS CONDITION MUST BE SATISFIED PRIOR TO THE ISSUE OF THE CONSTRUCTION CERTIFICATE.

 

32.       (142) BASIX - Compliance with all the conditions of the BASIX Certificate lodged with Council as part of this application.

 

General Engineering Conditions

 

33.       (A1) Design and Construction Standards:  All engineering plans and work shall be carried out in accordance with Council’s standards and relevant development control plans except as amended by other conditions.

 

34.       (A2) Materials on Roads and Footpaths: Where the applicant requires the use of Council land for placement of building waste, skips or storing materials a “Building waste containers or materials in a public place” application form is to be lodged. Council land is not to be occupied or used for storage until such application is approved. 

 

35.       (A3) Works on Council Property: Separate application shall be made to Council's Urban Services Division for approval to complete, any associated works on Council property.  This shall include hoarding applications, vehicular crossings, footpaths, drainage works, kerb and guttering, brick paving, restorations and any miscellaneous works. Applications shall be submitted prior to the start of any works on Council property.

 

36.       (A4) Permit to Stand Plant: Where the applicant requires the use of construction plant on the public road reservation, an “Application for Standing Plant Permit” shall be made to Council. Applications shall be submitted and approved prior to the start of any related works. Note: allow 2 working days for approval.

 

37.       (A5) Restoration: Public areas must be maintained in a safe condition at all times. Restoration of disturbed Council land is the responsibility of the applicant. All costs associated with restoration of public land will be borne by the applicant.

 

38.       (A6) Public Utility Relocation: If any public services are to be adjusted, as a result of the development, the applicant is to arrange with the relevant public utility authority the alteration or removal of those affected services. All costs associated with the relocation or removal of services shall be borne by the applicant.

 

 

39.       (A7) Pedestrian Access Maintained: Pedestrian access, including disabled and pram access, is to be maintained throughout the course of the construction as per AS-1742.3, ’Part 3 - Traffic control devices for works on roads’.

 

40.       (V8) Car Parking: All parking and associated facilities are to be designed and constructed in accordance with AS 2890 Series.

 

Engineering Conditions to be Complied with Prior to Construction Certificate

 

41.       (D1) Drainage Plans New: A stormwater drainage plan prepared and certified by a suitably qualified engineer is to be submitted to the Principal Certifying Authority prior to the issue of the Construction Certificate. The design is to be certified that it fully complies with, AS-3500 and Part O, Council's DCP-Stormwater Management.

 

42.       (E1) Proposed use of a drainage easement: Documentation demonstrating that the property benefits from a drainage easement is to be submitted to the Principal Certifying Authority prior to the issue of Construction Certificate.

 

43.       (D1) Excavation Greater Than 1m: Where there are structures on adjoining properties including all Council infrastructures, located within 5 meters of the proposed excavation.

The applicant shall:-

(a)  seek independent advice from a suitably qualified engineer on the impact of the proposed excavations on the adjoining properties

(b)  detail what measures are to be taken to protect those properties from undermining  during construction

(c)  provide Council with a certificate from the engineer on the necessity and adequacy of  support for the adjoining properties

 

The above matters are to be completed and documentation submitted to principal certifying authority prior to the issue of the Construction Certificate.

 

(d)  Provide a dilapidation report of the adjoining properties and Council infrastructure. The dilapidation survey must be conducted prior to the issue of the Construction Certificate. The extent of the survey must cover the likely “zone of influence” that may arise due to excavation works, including dewatering and/or construction induced vibration. The dilapidation report must be prepared by a suitably qualified engineer.

A second dilapidation report, recording structural conditions of all structures originally assessed shall be submitted to the principle certifying authority prior to the issue of the Occupation Certificate.

 

All recommendations of the suitably qualified engineer are to be carried out during the course of excavation. The applicant must give at least seven (7) days notice to the owner and occupiers of the adjoining allotments before the excavation works commence.

44.       (W1) Pool Construction: The pool design shall ensure that either during construction or upon completion, surface water is not be directed or diverted so as to have an adverse impact upon adjoining properties.

Council accepts no liability for any damage to the pool as a result of overland flows or high tide inundation. The property owner shall submit written acceptance of liability of any damages prior to the issue of the Construction Certificate.

 

45.       (B1) Council infrastructure damage bond: The applicant shall lodge with Council a $3000 bond or bank guarantee. The bond is to cover the repair of damage to Council's roads, footpaths, kerb and gutter, drainage or other assets as a result of the development. The bond will be released upon issuing of the Occupation Certificate. If Council determines that damage has occurred as a result of the development, the applicant will be required to repair the damage. Repairs are to be carried out within 14 days from the notice. All repairs are to be carried in accordance with Council’s requirements. The full bond will be retained if Council’s requirements are not satisfied. Lodgment of this bond is required prior to the issue of the Construction Certificate.

 

Engineering Condition to be Complied with Prior to Commencement of Construction

 

46.       (C2) Erosion and Sediment Control: The applicant shall install appropriate sediment control devices prior to the start of any works on the site. The devices shall be maintained during the construction period and replaced when necessary.

 

Engineering Condition to be Complied with Prior to Occupation Certificate

 

47.       (M2) Certificate of Satisfactory Completion:  Certificates from a registered and licensed Plumber or a suitably qualified Engineer must be obtained for the following matters. The plumber is to provide a copy of their registration papers with the certificate. The relevant Certificates are to be submitted to the Principal Certifying Authority prior to issue of any Occupation Certificate.

 

·    Confirming that the site drainage system has been constructed in accordance with the relevant Australian Standards and Council’s DCP-Stormwater Management. 

 

Tree Preservation Conditions

 

48.       (300)  Lane Cove Council regulates the Preservation of Trees and Vegetation in the Lane Cove local government area. Clause 5.9(3) of Lane Cove Local Environmental Plan 2009 [the "LEP"], states that a person must not ringbark, cut down, top, lop, remove, injure or wilfully destroy any tree or other vegetation to which any such development control plan applies without the authority conferred by development consent or a permit granted by the Council. Removal of trees or vegetation protected by the regulation is an offence against the Environmental Planning and Assessment Act 1979 (NSW). The maximum penalty that may be imposed in respect to any such offence is $1,100,000. The co-operation of all residents is sought in the preservation of trees in the urban environment and protection of the bushland character of the Municipality. All enquiries concerning the Preservation of Trees and Vegetation must be made at the Council Chambers, Lane Cove.

 

49.       (303)  There must be no stockpiling of topsoil, sand, aggregate, spoil or any other construction material or building rubbish on any nature strip, footpath, road or public open space park or reserve.

 

50.       (317) The Cheese tree at the rear of the site must be protected A 1.8 m high chain mesh fence shall be erected a radial distance of not less than 2.4 m from the trunk of the Cheese tree marked on the plans for retention. The tree protection area shall not be used for the storage of building materials, machinery, site sheds, or for advertising and soil levels within the tree protection area shall remain undisturbed.

 

51.       (new) A waterproof sign must be placed on the tree protection zone stating ‘NO ENTRY TREE PROTECTION ZONE – this fence and sign are not to be removed or relocated for the work duration.’  Minimum size of the sign is to be A3 portrait with NO ENTRY TREE PROTECTION ZONE in capital Arial Font size 100, and the rest of the text in Arial font size 65.

 

52.       (new) Tree protection measures and signage must be erected PRIOR TO COMMENCEMENT OF WORK. This includes demolition or site preparation works, and tree protection measures must remain in place for the duration of the development.

 

53.       (354)  Footing, trench or excavation that is within 3 m of any tree greater than  4m in height; including neighbouring trees, must be carried out using hand held tools only with no tree roots greater than 40mm diameter to be severed or damaged.

 

54.       (new) The Landscape Plan by Peter Glass and Associates Landscape Architects (Dwg No: 5110-01) dated 06/03/15 is to the satisfaction of Council and must be adopted as part of the development consent. 

 

55.       (new) All proposed hedging plants at the rear of the site must be of such a species that they may be maintained at a mature height that does not block or impair existing views from neighbouring properties.

 

 

The decision of the Panel was unanimous

 

 

37 Arabella Street, Longueville

 

DETERMINATION

 

That pursuant to section 80(1)(a) of the Environmental Planning and Assessment Act 1979, the Independent Hearing and Assessment Panel grants development consent to Development Application DA 89/2015 for the demolition of an existing rectory and construction of a new rectory on Lot 5, DP 2459 and known as 37 Arabella Street, Longueville subject to the following conditions:

 

General Conditions

 

1.         (20) That the development be strictly in accordance with the following drawings with project No. 1844, dated April 15, prepared by Fyfee Design Services except as amended by the following conditions.

 

-           Site Plan, 02/11, Amendment E;

-           Ground Floor, 03/11, Amendment E;

-           First Floor, 04/11, Amendment E;

-           Roof, 05/11, Amendment E;

-           Elevations, 06/11, amendment E;

-           Elevations, 07/11, amendment E;

-           Section, 08/11, Amendment E;

-           Landscape Plan, with Project No. 1844, 01/01;

-           Demolition Plan, 11/11, Amendment E.

 

2.         Amended plans to be submitted

 

Amended plans and specifications incorporating the following amendments are to be submitted with the application for a construction certificate:

 

(a)        The maximum width of the vehicle crossing at the property front boundary is 3m.

 

3.         (1) The submission of a Construction Certificate and its issue by Council or Private Certifier PRIOR TO CONSTRUCTION WORK commencing.

 

4.         (2) All building works are required to be carried out in accordance with the provisions of the Building Code of Australia.

 

5.         (11) The approved plans must be submitted to a Sydney Water Check agent or Customer Centre to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if further requirements need to be met.  Plans will be appropriately stamped.  For Quick Check agent details please refer to the web site www.sydneywater.com.au see Your Business then Building & Developing then Building & Renovating or telephone 13 20 92.

 

The consent authority or a private accredited certifier must:-

·          Ensure that a Quick Check agent/Sydney Water has appropriately stamped the plans before the issue of any Construction Certificate.

 

6.         (12) Approval is subject to the condition that the builder or person who does the residential building work complies with the applicable requirements of Part 6 of the Home Building Act 1989 whereby a person must not contract to do any residential building work unless a contract of insurance that complies with this Act is in force in relation to the proposed work.  It is the responsibility of the builder or person who is to do the work to satisfy Council or the PCA that they have complied with the applicable requirements of Part 6.  Council as the PCA will not release the Construction Certificate until evidence of Home Owners Warranty Insurance or an owner builder permit is submitted. THE ABOVE CONDITION DOES NOT APPLY TO COMMERCIAL/INDUSTRIAL CONSTRUCTION, OWNER BUILDER WORKS LESS THAN $5000 OR CONSTRUCTION WORKS LESS THAN $20,000.

 

7.         (17)  An Occupation Certificate being obtained from the Principal Certifying Authority before the occupation of the building.

 

8.         (35)  All demolition, building construction work, including earthworks, deliveries of building materials to and from the site to be restricted to the following hours:-

 

Monday to Friday (inclusive)                     7.00am to 5.30pm

Saturday                                                   7.00am to 4.00pm

No work to be carried out on Sundays or any public holidays.

 

A Notice/Sign showing permitted working hours and types of work permitted during those hours, including the applicant’s phone number, project manager or site foreman, shall be displayed at the front of the site.

 

9.         (36) Stockpiles of topsoil, sand, aggregate, spoil or other material capable of being moved by water to be stored clear of any drainage line, easement, natural watercourse, footpath, kerb or roadside.

 

10.       (37) The development shall be conducted in such a manner so as not to interfere with the amenity of the neighbourhood in respect of noise, vibration, smell, dust, waste water, waste products or otherwise.

 

11.       (48) Depositing or storage of builder's materials on the footpath or roadways within the Municipality without first obtaining approval of Council is PROHIBITED.

 

Separate approval must be obtained from Council's Works and Urban Services Department PRIOR TO THE PLACEMENT of any building waste container ("Skip") in a public place.

 

12.       (49) Prior to the commencement of any construction work associated with the development, the Applicant shall erect a sign(s) at the construction site and in a prominent position at the site boundary where the sign can be viewed from the nearest public place.  The sign(s) shall indicate:

a)      the name, address and telephone number of the Principal Certifying Authority;

b)      the name of the person in charge of the construction site and telephone number at which that person may be contacted outside working hours; and

c)      a statement that unauthorised entry to the construction site is prohibited.

 

The signs shall be maintained for the duration of construction works.

 

13.       (50) The cleaning out of ready-mix concrete trucks, wheelbarrows and the like into Council's gutter is PROHIBITED.

 

14.       (51) Lane Cove Council regulates the Preservation of Trees and Vegetation in the Lane Cove local government area. Clause 5.9(3) of Lane Cove Local Environmental Plan 2009 [the "LEP"], states that a person must not ringbark, cut down, top, lop, remove, injure or willfully destroy any tree or other vegetation to which any such development control plan applies without the authority conferred by development consent or a permit granted by the Council. Removal of trees or vegetation protected by the regulation is an offence against the Environmental Planning and Assessment Act 1979 (NSW). The maximum penalty that may be imposed in respect to any such offence is $1,100,000. The co-operation of all residents is sought in the preservation of trees in the urban environment and protection of the bushland character of the Municipality. All enquiries concerning the preservation of trees and vegetation must be made at the Council Chambers, Lane Cove.

 

15.       Standard Condition (56) Where Lane Cove Council is appointed as the Principal Certifying Authority, it will be necessary to book an inspection for each of the following stages during the construction process.  Forty eight (48) hours notice must be given prior to the inspection being required:-

 

a)      The pier holes/pads before filling with concrete.

b)      All reinforcement prior to filling with concrete.

c)      The dampcourse level, ant capping, anchorage and floor framing before the floor material is laid.

d)      Framework including roof and floor members when completed and prior to covering.

e)      Installation of steel beams and columns prior to covering.

f)       Waterproofing of wet areas.

g)      Stormwater drainage lines prior to backfilling.

h)      Completion.

 

16.       Standard Condition (57) Structural Engineer's details being submitted PRIOR TO ISSUE OF CONSTRUCTION CERTIFICATE for the following:-

a)         underpinning;

b)         retaining walls;

c)         footings;

d)         reinforced concrete work;

e)         structural steelwork;

f)          upper level floor framing.

 

17.       (63) All metal deck roofs being of a ribbed metal profile or colourbond corrugated galvanised or zincalume iron, in a mid to dark colour range.

 

18.       Standard Condition (64) A check survey certificate is to be submitted at the completion of:-

a          Dampcourse level;

b          The establishment of the first floor level;

c          The roof framing; and

d          The completion of works.

 

Note:   All levels are to relate to the reduced levels as noted on the approved architectural plans and should be cross-referenced to Australian Height Datum.

 

19.       (66) The removal, handling and disposal of asbestos from building sites being carried out in accordance with the requirements of the Occupational Health and Safety Act and the Regulations.  Details of the method of removal to be submitted PRIOR TO COMMENCING ANY DEMOLITION WORKS.

 

20.       (72) The proposed works must be confined within the boundaries of the site.

 

21.       (77) All spillage deposited on the footpaths or roadways to be removed at the completion of each days work.

 

22.       (78) The site being properly fenced to prevent access of unauthorised persons outside of working hours.

 

23.       (79) Compliance with Australian Standard 2601 - The Demolition of Structures.

 

24.       (130)  Compliance with the Waste Management Plan submitted along with the application.

 

25.       (132)  It should be understood that this consent in no way relieves the owners or applicant from any obligation to obtain any other approval which may be required under any covenant affecting the land or otherwise nor relieve a person from the legal civil consequences of not complying with any such covenant.

 

26.       (141) Long Service Levy  Compliance with Section 109F of the Environmental Planning and Assessment Act 1979; payment of the Long Service Levy payable under Section 34 of the Building and Construction Industry Long Service Payments Act 1986 (or, where such a levy is payable by installments, the first installment of the levy) – All building works in excess of $25,000 are subject to the payment of a Long Service Levy at the rate of 0.35%.

 

COMPLIANCE WITH THE REQUIREMENTS OF THIS CONDITION MUST BE SATISFIED PRIOR TO THE ISSUE OF THE CONSTRUCTION CERTIFICATE.

 

27.       (142) BASIX - Compliance with all the conditions of the BASIX Certificate lodged with Council as part of this application.

 

General Engineering Conditions

 

28.       (A1) Design and Construction Standards:  All engineering plans and work shall be carried out in accordance with Council’s standards and relevant development control plans except as amended by other conditions.

 

29.       (A2) Materials on Roads and Footpaths: Where the applicant requires the use of Council land for placement of building waste, skips or storing materials a “Building waste containers or materials in a public place” application form is to be lodged. Council land is not to be occupied or used for storage until such application is approved. 

30.       (A3) Works on Council Property: Separate application shall be made to Council's Urban Services Division for approval to complete, any associated works on Council property.  This shall include hoarding applications, vehicular crossings, footpaths, drainage works, kerb and guttering, brick paving, restorations and any miscellaneous works. Applications shall be submitted prior to the start of any works on Council property.

 

31.       (A4) Permit to Stand Plant: Where the applicant requires the use of construction plant on the public road reservation, an “Application for Standing Plant Permit” shall be made to Council. Applications shall be submitted and approved prior to the start of any related works. Note: allow 2 working days for approval.

 

32.       (A5) Restoration: Public areas must be maintained in a safe condition at all times. Restoration of disturbed Council land is the responsibility of the applicant. All costs associated with restoration of public land will be borne by the applicant.

 

33.       (A6) Public Utility Relocation: If any public services are to be adjusted, as a result of the development, the applicant is to arrange with the relevant public utility authority the alteration or removal of those affected services. All costs associated with the relocation or removal of services shall be borne by the applicant.

 

34.       (A7) Pedestrian Access Maintained: Pedestrian access, including disabled and pram access, is to be maintained throughout the course of the construction as per AS-1742.3, ’Part 3 - Traffic control devices for works on roads’.

 

35.       (A8) Council Drainage Infrastructure: The proposed construction shall not encroach onto any existing Council stormwater line or drainage easement. If a Council stormwater line is located on the property during construction, Council is to be immediately notified. Where necessary the stormwater line is to be relocated to be clear of the proposed building works. All costs associated with the relocation of the stormwater line are to be borne by the applicant.

 

36.       (V8) Car Parking: All parking and associated facilities are to be designed and constructed in accordance with AS 2890 Series.

 

37.       (R2) Rainwater Reuse Tanks: The applicant is to install a rainwater reuse system with a minimum effective capacity of 10,000 Litres. Rainwater tanks are to be installed in accordance with Council’s rainwater tank policy and relevant Australian standards. The plumbing requirements are as follows

§ Rainwater draining to the reuse tanks are to drain from the roof surfaces only. No “on - ground” surfaces are to drain to the reuse tank.  “On - ground” surfaces are to drain via a separate system.

§ Mosquito protection & first flush device shall be fitted to the reuse tank.

§ The overflow from the rainwater reuse tank is to drain by gravity to the receiving system.

§ Rainwater tank is to be connected to all new toilets, one cold water washing machine tap and one outside tap within the development.

 

Engineering Conditions to be Complied with Prior to Construction Certificate

 

38.       (D1) Drainage Plans New: A stormwater drainage plan prepared and certified by a suitably qualified engineer is to be submitted to the Principal Certifying Authority prior to the issue of the Construction Certificate. The design is to be certified that it fully complies with, AS-3500 and Part O, Council's DCP-Stormwater Management.

 

39.       (B1) Council infrastructure damage bond: The applicant shall lodge with Council a $3000 bond or bank guarantee. The bond is to cover the repair of damage to Council's roads, footpaths, kerb and gutter, drainage or other assets as a result of the development. The bond will be released upon issuing of the Occupation Certificate. If Council determines that damage has occurred as a result of the development, the applicant will be required to repair the damage. Repairs are to be carried out within 14 days from the notice. All repairs are to be carried in accordance with Council’s requirements. The full bond will be retained if Council’s requirements are not satisfied. Lodgement of this bond is required prior to the issue of the Construction Certificate.

 

Engineering Condition to be Complied with Prior to Commencement of construction

 

40.       (C2) Erosion and Sediment Control: The applicant shall install appropriate sediment control devices prior to the start of any works on the site. The devices shall be maintained during the construction period and replaced when necessary.

 

Engineering Condition to be Complied with Prior to Occupation Certificate

 

41.       (M2) Certificate of Satisfactory Completion:  Certificates from a registered and licensed Plumber or a suitably qualified Engineer must be obtained for the following matters. The plumber is to provide a copy of their registration papers with the certificate. The relevant Certificates are to be submitted to the Principal Certifying Authority prior to issue of any Occupation Certificate.

·    Confirming that the site drainage system has been constructed in accordance with the relevant Australian Standards and Council’s DCP-Stormwater Management. 

 

 

Landscaping Conditions

 

42.       (300)  Lane Cove Council regulates the Preservation of Trees and Vegetation in the Lane Cove local government area. Clause 5.9(3) of Lane Cove Local Environmental Plan 2009 [the "LEP"], states that a person must not ringbark, cut down, top, lop, remove, injure or wilfully destroy any tree or other vegetation to which any such development control plan applies without the authority conferred by development consent or a permit granted by the Council. Removal of trees or vegetation protected by the regulation is an offence against the Environmental Planning and Assessment Act 1979 (NSW). The maximum penalty that may be imposed in respect to any such offence is $1,100,000. The co-operation of all residents is sought in the preservation of trees in the urban environment and protection of the bushland character of the Municipality. All enquiries concerning the Preservation of Trees and Vegetation must be made at the Council Chambers, Lane Cove.

 

43.       (302)  The applicant must obtain a Tree Preservation Order Work Authority prior to the pruning or removal of any trees growing on site, located in neighbouring properties or trees located in adjacent reserves that overhang the site, including the cutting of any tree roots greater than 40 mm in diameter.

 

44.       (303)  There must be no stockpiling of topsoil, sand, aggregate, spoil or any other construction material or building rubbish on any nature strip, footpath, road or public open space park or reserve.

 

45.       (354)  Footing, trench or excavation that is within 3m of any tree greater than 4m in height; including neighbouring trees, must be carried out using hand held tools only with no tree roots greater than 40mm diameter to be severed or damaged.

 

 

The decision of the Panel was unanimous

 

 

43-47 Kenneth Street, Longueville

 

DETERMINATION

 

That pursuant to Section 80(1)(a) of the Environmental Planning and Assessment Act, 1979, as amended, the Independent Hearing and Assessment Panel grants development consent to Development Application D79/15 for the change of use of 43 Kenneth Street from a vacant dwelling house to an ancillary office and patient support facility as part of the adjoining hospital at 45-47 Kenneth Street involving the construction of a joining disabled ramp on Lot 1, DP 578918 and Lot 54, DP 2459 and known as 43-47 Kenneth Street, Longueville subject to the following conditions:

 

1.         (20) That the development be strictly in accordance with drawing numbers DA02 and DA03 dated 4 June 2015; except as amended by the following conditions.

 

2.         To provide privacy for 41 Kenneth Street:

 

(a)        The proposed covered timber access ramp to the rear of 43 Kenneth Street being deleted from the plans.

 

(b)        The proposed connection between the existing hospital and the building on 43 Kenneth Street being by a covered or enclosed link at least 2m wide from the northern wall of the Patient and Visitor’s Lounge to the southern wall of the Transitional Care Area or southern wall of the rear Office.

 

(c)        The windows in the northern wall of the Office and the Transitional Care Area being fixed and double glazed.

 

           (d)         The provision to No.43 Kenneth St, of an acoustic screen wall along the side of the rear deck closest to No.41 Kenneth St. The acoustic wall to extend from the wall of the house, along the side of the deck and continue to the bottom of the rear stairs down from the deck to the back yard of No.43.  The wall to extend upwards from the floor of the deck to the underside of the roof over the deck, and beyond the roof taper down to a height of 1.8m minimum above the last stair tread at the end of the wall.  The acoustic treatment to be in materials recommended by a qualified acoustic expert to minimise disturbance to and provide reasonable domestic acoustic privacy to the residents of No.41 Kenneth St.

 

(e)        The existing Plane Tree towards the rear of 43 Kenneth Street being retained.

 

            (f)         The rear deck of No.43 Kenneth St not to be used for group activities for the same reasons as Condition 2(d).

 

            (g)        The doors from the proposed Transitional Care Area of No.43 onto its rear deck to be self-closing. This is for the same reasons as Condition 2(d).

 

            (h)        The side setback pathway of No.43 adjacent to the boundary with No.41 Kenneth St to be used for egress only. This is to maintain reasonable amenity and privacy to No.41.

 

            (i)         The hospital to be limited to a maximum of 40 licensed beds, and a maximum of 45 equivalent full-time staff at 35 hours per week each, plus two visiting physiotherapists.  The full-time equivalent may comprise staff working part-time, or broken hours, or casual shifts. This is to ensure the applicant/operators assurance that this consent does not constitute an intensification of the hospital use and consequent impacts on the locality and nearby residents.

 

            (j)         The existing garage on No.43 Kenneth St is to be permanently maintained and used every day and night for the parking of two hospital staff cars.  

 

            Plans being altered to comply and approved by Council prior to the issue of a Construction Certificate.

 

3.         (1) The submission of a Construction Certificate and its issue by Council or Private Certifier PRIOR TO CONSTRUCTION WORK commencing.

 

4.         (2) All building works are required to be carried out in accordance with the provisions of the Building Code of Australia.

 

5.         (11) The approved plans must be submitted to a Sydney Water Check agent or Customer Centre to determine whether the development will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if further requirements need to be met.  Plans will be appropriately stamped.  For Quick Check agent details please refer to the web site www.sydneywater.com.au see Your Business then Building & Developing then Building & Renovating or telephone 13 20 92.

 

            The consent authority or a private accredited certifier must:-

 

·          Ensure that a Quick Check agent/Sydney Water has appropriately stamped the plans before the issue of any Construction Certificate.

 

6.         (17)  An Occupation Certificate being obtained from the Principal Certifying Authority before the occupation of the building.

 

7.         (35)  All demolition, building construction work, including earthworks, deliveries of building materials to and from the site to be restricted to the following hours:-

 

Monday to Friday (inclusive)                     7.00am to 5.30pm

Saturday                                                   7.00am to 4.00pm

No work to be carried out on Sundays or any public holidays.

 

            A Notice/Sign showing permitted working hours and types of work permitted during those   hours, including the applicant’s phone number, project manager or site foreman, shall be displayed at the front of the site.

 

8.         (36) Stockpiles of topsoil, sand, aggregate, spoil or other material capable of being moved by water to be stored clear of any drainage line, easement, natural watercourse, footpath, kerb or roadside.

 

9.         (37) The development shall be conducted in such a manner so as not to interfere with the amenity of the neighbourhood in respect of noise, vibration, smell, dust, waste water, waste products or otherwise.

 

10.       (45) A “Fire Safety Schedule” specifying the fire safety measures that are currently implemented in the building premises and the fire safety measures proposed or required to be implemented in the building premises as required by Clause 168 – Environmental Planning & Assessment Regulation 2000 are to be submitted and approved PRIOR TO THE ISSUE OF THE CONSTRUCTION CERTIFICATE.

 

11.       (48) Depositing or storage of builder's materials on the footpath or roadways within the Municipality without first obtaining approval of Council is PROHIBITED.

 

Separate approval must be obtained from Council's Works and Urban Services Department PRIOR TO THE PLACEMENT of any building waste container ("Skip") in a public place.

 

12.       (49) Prior to the commencement of any construction work associated with the development, the Applicant shall erect a sign(s) at the construction site and in a prominent position at the site boundary where the sign can be viewed from the nearest public place.  The sign(s) shall indicate:

a)         the name, address and telephone number of the Principal Certifying Authority;

b)         the name of the person in charge of the construction site and telephone number at which that person may be contacted outside working hours; and

c)         a statement that unauthorised entry to the construction site is prohibited.

The signs shall be maintained for the duration of construction works.

 

 

13.       (50) The cleaning out of ready-mix concrete trucks, wheelbarrows and the like into Council's gutter is PROHIBITED.

 

14.       Standard Condition (56) Where Lane Cove Council is appointed as the Principal Certifying Authority, it will be necessary to book an inspection for each of the following stages during the construction process.  Forty eight (48) hours notice must be given prior to the inspection being required:-

a)         The pier holes/pads before filling with concrete.

b)         Framework including roof and floor members when completed and prior to covering.

c)         Installation of steel beams and columns prior to covering.

d)         Stormwater drainage lines prior to backfilling.

e)         Completion.

 

15.       Standard Condition (57) Structural Engineer's details being submitted PRIOR TO ISSUE OF CONSTRUCTION CERTIFICATE for the following:-

a)         Footings; and

b)         Structural steelwork.

 

16.       (63) All metal deck roofs being of a ribbed metal profile or colourbond corrugated             galvanised or zincalume iron, in a mid to dark colour range.

 

17.       (78) The site being properly fenced to prevent access of unauthorised persons outside of working hours.

 

18.       (79) Compliance with Australian Standard 2601 - The Demolition of Structures.

 

19.       (87) Pedestrians' portion of footpath to be kept clear and trafficable at all times.

 

20.       (132)  It should be understood that this consent in no way relieves the owners or applicant from any obligation to obtain any other approval which may be required under any covenant affecting the land or otherwise nor relieve a person from the legal civil consequences of not complying with any such covenant.

 

21.       (137)  Lane Cove Council charges a fee for the registration of any Part 4A Certificates (compliance, construction, occupation or subdivision certificates) issued by an accredited certifier under the Environmental Planning and Assessment Act.

 

22.       (141) Long Service Levy  Compliance with Section 109F of the Environmental Planning and Assessment Act 1979; payment of the Long Service Levy payable under Section 34 of the Building and Construction Industry Long Service Payments Act 1986 (or, where such a levy is payable by instalments, the first instalment of the levy) – All building works in excess of $25,000 are subject to the payment of a Long Service Levy at the rate of 0.35%.

 

COMPLIANCE WITH THE REQUIREMENTS OF THIS CONDITION MUST BE SATISFIED PRIOR TO THE ISSUE OF THE CONSTRUCTION CERTIFICATE.

 

Building Surveyor’s Conditions

 

23.    The proposed connection between the buildings must be constructed in accordance with AS1428.1-2009.  Details to be provided to the certifying authority prior to the issue of a Construction Certificate.

 

24.    The consolidation of Lot 54 of DP 2459 and Lot 1 of DP 578918 is to be done prior to the issue of a Construction Certificate.

 

25.    The building must comply with the Category 1 fire safety provisions EP1.3, EP2.1, EP2.2, EP1.4 as are applicable to the building’s proposed new use.  Details of the design of the nominated Category 1 fire safety provisions must be provided to the certifying authority prior to the issue of a Construction Certificate.

 

26.    A certificate from a structural engineer certifying the structural capacity of the existing building will be appropriate to the building’s proposed new use must be provided to the certifying authority prior to the issue of a Construction Certificate.

 

Tree Preservation Conditions

 

27.       (51) Lane Cove Council regulates the Preservation of Trees and Vegetation in the Lane Cove local government area. Clause 5.9(3) of Lane Cove Local Environmental Plan 2009 [the "LEP"], states that a person must not ringbark, cut down, top, lop, remove, injure or willfully destroy any tree or other vegetation to which any such development control plan applies without the authority conferred by development consent or a permit granted by the Council. Removal of trees or vegetation protected by the regulation is an offence against the Environmental Planning and Assessment Act 1979 (NSW). The maximum penalty that may be imposed in respect to any such offence is $1,100,000. The co-operation of all residents is sought in the preservation of trees in the urban environment and protection of the bushland character of the Municipality. All enquiries concerning the preservation of trees and vegetation must be made at the Council Chambers, Lane Cove.

 

General Engineering Conditions

 

28.    (A1) Design and Construction Standards:  All engineering plans and work shall be carried out in accordance with Council’s standards and relevant development control plans except as amended by other conditions.

 

29.    (A2) Materials on Roads and Footpaths: Where the applicant requires the use of Council land for placement of building waste, skips or storing materials a “Building waste containers or materials in a public place” application form is to be lodged. Council land is not to be occupied or used for storage until such application is approved. 

 

30.    (A3) Works on Council Property: Separate application shall be made to Council's Urban Services Division for approval to complete, any associated works on Council property.  This shall include hoarding applications, vehicular crossings, footpaths, drainage works, kerb and guttering, brick paving, restorations and any miscellaneous works. Applications shall be submitted prior to the start of any works on Council property.

 

31.    (A4) Permit to Stand Plant: Where the applicant requires the use of construction plant on the public road reservation, an “Application for Standing Plant Permit” shall be made to Council. Applications shall be submitted and approved prior to the start of any related works. Note: allow 2 working days for approval.

 

 

32.    (A5) Restoration: Public areas must be maintained in a safe condition at all times. Restoration of disturbed Council land is the responsibility of the applicant. All costs associated with restoration of public land will be borne by the applicant.

 

33.    (A6) Public Utility Relocation: If any public services are to be adjusted, as a result of the development, the applicant is to arrange with the relevant public utility authority the alteration or removal of those affected services. All costs associated with the relocation or removal of services shall be borne by the applicant.

 

34.    (A7) Pedestrian Access Maintained: Pedestrian access, including disabled and pram access, is to be maintained throughout the course of the construction as per AS-1742.3, ’Part 3 - Traffic control devices for works on roads’.

 

35.    (A8) Council Drainage Infrastructure: The proposed construction shall not encroach onto any existing Council stormwater line or drainage easement. If a Council stormwater line is located on the property during construction, Council is to be immediately notified. Where necessary the stormwater line is to be relocated to be clear of the proposed building works. All costs associated with the relocation of the stormwater line are to be borne by the applicant.

 

Engineering Conditions to be Complied with Prior to Construction Certificate

 

36.       (S2) Stormwater Requirement: The stormwater runoff from the new and altered impervious areas within the development shall be connected to the existing drainage system in accordance with AS-3500 and Part O, Council's DCP-Stormwater Management.

The existing stormwater system is to be certified that it is in good working order and meets the requirements set out in Part O, Council’s DCP-Stormwater Management. The certification is to be carried out by a fully licensed and insured plumber or a suitably qualified engineer prior to the issue of the Construction Certificate.

 

37.    (B1) Council infrastructure damage bond: The applicant shall lodge with Council a $3000 bond or bank guarantee. The bond is to cover the repair of damage to Council's roads, footpaths, kerb and gutter, drainage or other assets as a result of the development. The bond will be released upon issuing of the Occupation Certificate. If Council determines that damage has occurred as a result of the development, the applicant will be required to repair the damage. Repairs are to be carried out within 14 days from the notice. All repairs are to be carried in accordance with Council’s requirements. The full bond will be retained if Council’s requirements are not satisfied. Lodgement of this bond is required prior to the issue of the Construction Certificate.

 

Engineering Condition to be Complied with Prior to Commencement of Construction

 

38.    (C2) Erosion and Sediment Control: The applicant shall install appropriate sediment control devices prior to the start of any works on the site. The devices shall be maintained during the construction period and replaced when necessary.

 

Engineering Condition to be Complied with Prior to Occupation Certificate

 

39.    (M2) Certificate of Satisfactory Completion:  Certificates from a registered and licensed Plumber or a suitably qualified Engineer must be obtained for the following matters. The plumber is to provide a copy of their registration papers with the certificate. The relevant Certificates are to be submitted to the Principal Certifying Authority prior to issue of any Occupation Certificate.

·    Confirming that the site drainage system has been constructed in accordance with the approved drawings, the relevant Australian Standards and Part O, Council’s DCP-Stormwater Management.

 

The decision of the Panel was unanimous

 

 

The meeting closed at 8.40pm

 

********* END OF MINUTES *********